Single stage vs two stage tendering - procurement process (2024)

Blog

22/07/2021

Share article

TwitterLinkedIn

In difficult times, it is easy to understand why construction contractors may cut prices to win work.

We should start by saying that profit shouldn't be a dirty word in the construction industry - after all, businesses need cashflow to survive and to ensure that they remain engaged with their supply chain. However, recent figures within the sector have given some to question the sustainability of such rates, and whether the method of procurement has been a contributor.

In essence, there are two main procurement routes; single stage and two stage tendering.

Single stage tendering

Single-stage tendering, also known as traditional tendering, is when a client issues a tender for the whole project, with all the relevant information provided at the point of issue. The process seeks to ensure that the client is able to secure a competitive price and to this end, the contractor may decide to price aggressively in order to secure the project.

It can be an efficient route to obtaining a contractor. However, if elements from the project specification are missing or are unclear, it can lead to adjustments being made later in the contract, and the final account may be very different as unforeseen costs mount up. The added pressure may mean contractors look for ways to cut costs, possibly at the expense of quality.

The process also means clients are unable to benefit from early contractor engagement. As the process can take a long time and contractors are increasingly reluctant to engage in single stage tenders due to the bidding risks,

Single stage vs two stage tendering - procurement process (1)

Two stage tendering

Two-stage tendering involves an initial information stage, facilitating early collaboration between client and contractor. For most projects, and especially for those that are more complex, it is useful to obtain input before there is sufficient information available for the main contract. This enables early input between the main contractor and client, helping to ensure design and cost certainty, accelerating the project timescales.

This initial phase allows the contractor to submit details under a pre-construction agreement and includes aspects regarding project preliminaries, method statements, design, overheads, and profit.

Ideally, the second stage of the process is then simply a exercise, using the criteria agreed in the first stage. In reality however, there may be some items not previously considered, around which negotiations will ensue. These typically include where sub-contractors are used. The second stage construction contract is negotiated by the main contractor, and subject to the approval of the design team.

Single stage vs two stage tendering - procurement process (2)

The collaborative approach that the two stage procurement process promotes ensures that both the client and contractor can benefit from better outcomes. It also negates the need for value engineering to reduce cost.

Working with SCAPE is all about partnership and our consultancy, civil engineering and construction frameworks actively encourage and promote early contractor engagement and the two stage tender process.

As part of our framework process, we invite potential delivery partners to submit bids based on a quality vs price ratio of 70:30 respectively. This emphasis on quality enables our clients to benefit from delivery partners who focus on ensuring the best possible outcomes, whilst also maximising social value, sustainability, environmental and socio-economic benefits that leave lasting legacies in our local communities.

The price element focuses on assessing for NEC based project agreements, including overhead and profit percentages. Charges for life-cycle, design management, pre-construction and people rates are then included within project agreements - typically, around 10% of the project value. With overhead and profit rates fixed for the framework term, clients receive protection from rising market forces.

In addition, SCAPE delivery partners are required to demonstrate, with a full explanation of their logic and assumptions, how they have derived at the tendered charges, rates and percentages.

Discover frameworks that work for you

SCAPE procurement stages:

Stage one

Our frameworks are direct award meaning that our clients benefit from early contractor engagement, which facilitates effective communication and collaboration. This is essentially stage one and ensures the client, contractor and wider stakeholders are fully committed to delivering the best possible outcome.

Stage two

The second stage involves both the contractor and client engaging to fully price the project. In this instance, the SCAPE framework requires the delivery partner to obtain three quotes for each package of works and to evidence value for money. This is true for both option A and C contracts, although the very nature of the option C contract facilitates greater visibility.

Far from promoting a race to the bottom, SCAPE frameworks focus on quality outcomes for clients, evidencing value for money whilst encouraging early contractor engagement and helping clients accelerate projects with collaboration, creating time and saving costs.

Single stage vs two stage tendering - procurement process (3)

For the public sector

Discover actively-managed frameworks

All our frameworks deliver efficiency, effectiveness and economy, and incorporate social value, community benefits, and environmental outcomes.

Start your project today

Related news

BlogSustainable procurement: don’t let the pursuit of perfect be the enemy of progressThe crucial role of local government in facilitating our response to the climate emergency has long been understood. Through local planning, targeted investment and community engagement, councils can be the catalyst for...05/03/2024NewsSCAPE Procurement Director appointed as new NACF ChairWe are delighted to announce that our Procurement Director John Simons has been appointed as Chair of the National Association of Construction Frameworks (NACF).22/02/2024NewsConsultancy frameworksSCAPE, Perfect Circle and Stantec awarded bridge maintenance contractSCAPE, Perfect Circle and Stantec will be jointly supporting Reading Borough Council in managing and maintaining its bridges and highway structures.14/02/2024
Single stage vs two stage tendering - procurement process (7)
Single stage vs two stage tendering - procurement process (2024)

FAQs

Single stage vs two stage tendering - procurement process? ›

The two-stage tendering process may be more time-consuming and this may not be appealing to employers with a tight development programme. Increased contractor involvement in the initial project planning stage can play a negative role in the design plan if the contractor has hidden agendas.

What is the difference between single stage and two stage procurement? ›

The main aim of the single-stage approach is to generate a firm price at the outset through a competitive tendering process, where-as the two-stage approach embraces a collaborative open book approach throughout the project.

What is a 2 stage tendering? ›

This form of tendering is typically applied to complex projects where the Employer (the end client) wants to appoint a Main Contractor, or more commonly by the Main Contractor in their employment of a specialist Subcontractor for a technical, design-focused package such as cladding or curtain walling.

What is a two step procurement process? ›

The two-step competitive sealed bidding procurement method is designed to obtain the benefits of competitive sealed bidding by award of a contract to the lowest, responsive, responsible bidder while also allowing competitive sealed negotiation-like procedure through solicitation of technical offers and the conduct of ...

What are the disadvantages of two stage tendering? ›

Disadvantages of the two-stage tendering process: Extended procurement lead-time due to two stage submission process. Second stage negotiations with the highest ranked bidder could prove difficult and protracted. There is risk of price escalation, and negotiations becoming adversarial in the second stage.

Why use single stage tendering? ›

Single stage tendering

The process seeks to ensure that the client is able to secure a competitive price and to this end, the contractor may decide to price aggressively in order to secure the project. It can be an efficient route to obtaining a contractor.

Why do we use two stage tendering? ›

ADVANTAGES OF TWO STAGE TENDERING FOR THE EMPLOYER

This method of procurement is often used when an employer wants a project to start as soon as possible. Achieving early appointment of the contractor, prior to completion of the design, potentially leads to an earlier start on site which may mean earlier completion.

What are the stages of tendering? ›

Tenders are usually conducted in four stages: Prequalification; the issue of tender documents; receipt and review of tenders; award of contract.

What are the seven basic steps in the procurement process? ›

The 7 Key Steps of a Procurement Process
  • Step 1 – Identify Goods or Services Needed. ...
  • Step 2 – Consider a List of Suppliers. ...
  • Step 3 – Negotiate Contract Terms with Selected Supplier. ...
  • Step 4 – Finalise the Purchase Order. ...
  • Step 5 – Receive Invoice and Process Payment. ...
  • Step 6 – Delivery and Audit of the Order.

What are the three types of procurement process? ›

Types of procurement
  • Direct procurement. Direct procurement is the obtainment of goods, materials or services a business can use to generate profit through the production of an end-product or resale. ...
  • Indirect procurement. ...
  • Services procurement. ...
  • Goods procurement.
Mar 3, 2023

What are the two main types of procurement? ›

Types of Procurement
Direct ProcurementIndirect Procurement
What is it?Any good or service required to produce an end productAll non-production-related goods or services
ExamplesRaw materials, components and parts, machinery, items purchased for resaleOffice supplies, marketing services, utilities
Apr 3, 2024

What are the 3 P's for procurement management process? ›

The Three P's of Procurement

There are three Ps in the procurement management process; people, process, and paper. The people aspect refers to the people who are responsible at different stages of the procurement process.

What is lowest bid tendering? ›

The low bid method is the most common form of competitive bidding where the lowest responsive and responsible bidder is awarded the project.

What are the disadvantages of open tendering? ›

Some disadvantages of the open tendering process are:
  • Lengthy timeframe for completion of the procurement action,
  • Requires strict adherence to procedures,
  • Assumes existing internal capacity for the completion of clear and precise specifications,

What are the advantages of two stage design and build? ›

The two-stage procurement process promotes collaborative working and significantly de-risks the project for all stakeholders, providing greater cost and programme certainty as the design has been fully developed collaboratively between all parties.

What is a single-stage procurement? ›

Single-stage tendering

In this method, potential suppliers or contractors are invited to submit a bid for the entire project or contract in one stage. This includes detailed design, cost and program information. The bids are then evaluated and a single contract is awarded to the successful bidder.

What is the difference between single-stage and double stage systems? ›

The main difference between single-stage versus two-stage air compressors is the number of times the air is compressed. While a single-stage compressor compresses air once, a dual-stage compressor compresses twice for higher pressure and power.

What is the difference between single bid system and two bid system? ›

Single Bid - All documents with Price to be submitted in a single Envelope. Double Bid or 2 Bid Tenders - 2 Envelopes - 1 for Techno-commercial Documents and 2nd for Price. Evaluation happen on the basis of documents submitted in the Techno-Commercial Envelope.

Top Articles
Latest Posts
Article information

Author: Lilliana Bartoletti

Last Updated:

Views: 5591

Rating: 4.2 / 5 (53 voted)

Reviews: 92% of readers found this page helpful

Author information

Name: Lilliana Bartoletti

Birthday: 1999-11-18

Address: 58866 Tricia Spurs, North Melvinberg, HI 91346-3774

Phone: +50616620367928

Job: Real-Estate Liaison

Hobby: Graffiti, Astronomy, Handball, Magic, Origami, Fashion, Foreign language learning

Introduction: My name is Lilliana Bartoletti, I am a adventurous, pleasant, shiny, beautiful, handsome, zealous, tasty person who loves writing and wants to share my knowledge and understanding with you.